Material

Copper

High-conductivity copper for thermal and electrical parts; plates excellently.

Products

Products in Copper

Laser & Photonics Components Demo

Laser Pump Chamber Body

Turned / milled pump chamber body for laser pump sources, welded and finished as an assembly-ready part. Demo placeholder product.

Explore

Thermal Management Components Demo

Copper Heat Sink Blank

Copper heat sink blanks and skived-fin bodies for laser and power electronics. Demo placeholder product.

Explore

Precision Housings & Enclosures Demo

Brazed Sensor Housing

Welded / brazed sensor housing for pressure-exposed optical assemblies. Demo placeholder product.

Explore

Capabilities

Capabilities in Copper

Manufacturing capability Draft copy

Etching

Ultra-thin metal parts by precision etching — optics, encoders, photonics across ten+ alloys.

Explore

Manufacturing capability Draft copy

Precision Welding

Precision welding for critical assemblies, including low-temperature copper-to-aluminum sealing.

Explore

Reference Draft copy

Materials

The material range behind our parts — metals, sealing alloys and engineering plastics.

Explore

Manufacturing capability Draft copy

CNC Machining

High-precision CNC milling and turning, benchmarked to defense, medical and optical-communication standards.

Explore

Manufacturing capability Draft copy

CNC Milling

Multi-face milling for housings, cold plates and structural parts to ±0.005 mm benchmark accuracy.

Explore

Manufacturing capability Draft copy

CNC Turning

Turned parts with no minimum order — simple to complex irregular profiles, prototype to volume.

Explore

Case studies

Case studies in Copper

Resources

Resources in Copper

Manufacturing Guides

Aluminum vs Copper Cold Plates

Copper conducts twice as well, aluminum weighs a third and costs less — choose by thermal budget, weight and coolant, not by folklore.

Read

Request a Quote

Have a drawing or technical requirement?

Upload your drawing and tell us your material, tolerance, quantity and application. Our engineering team replies within 1–2 business days.