Before importing machined parts from China, agree the drawing revision, material traceability, inspection evidence, shipment documents and destination-market requirements with your supplier and customs broker. This checklist helps US and EU buyers prepare the document set and purchase-order requirements before shipment.
1. The paperwork decides the shipment
Customs does not see your part. It sees a description, a value, an origin and a paper trail. If the commercial invoice says “metal parts” and the material certificate says 6061-T6, while the drawing calls out 7075, the shipment stops. The same happens when a RoHS declaration is missing for a plated part entering the EU, or when the declared value looks nothing like the transaction.
Three documents cause most of the delay: the material certificate, the origin declaration, and the market-access declaration for the destination. Each of them should exist before the goods are packed, not after they are booked.
2. The document set to collect
Material and process evidence
- Mill certificate or material test report (MTR) — heat number, chemical composition and mechanical properties. For European customers this is usually requested as EN 10204 3.1 (issued by the manufacturer’s independent inspection representative) or 2.2 (manufacturer’s declaration of compliance with the order). Ask which one your customer’s quality department accepts before quoting.
- Heat / lot traceability — the link between the certificate’s heat number, the parts in the box and the inspection record. Without it, a certificate is just a piece of paper.
- Process certificates for finishing — plating thickness and adhesion (for example Cu–Ni–Au stacks), anodizing type and coating weight, passivation, or a brazing/welding procedure and operator qualification where the joint is critical.
Market-access declarations
- EU — RoHS: declaration under Directive 2011/65/EU as amended by (EU) 2015/863 (ten restricted substances). Custom machined metal parts are usually in scope once they are part of electrical or electronic equipment; the declaration is cheap to produce and expensive to be missing at customs.
- EU — REACH: statement on SVHC content above 0.1 % w/w per article, plus the SCIP notification duty that falls on the EU importer. The candidate list is updated roughly twice a year, so an old declaration is a red flag.
- EU — CE marking: normally not applicable to a custom machined part. CE applies to the finished machine or assembly placed on the market; the integrator marks it. Be suspicious of a supplier who offers to “CE mark” a bracket.
- Responsible minerals — CMRT and EMRT: the RMI reporting-template guidance defines CMRT for tin, tantalum, tungsten and gold (3TG). Cobalt is covered by EMRT, not CMRT. Agree the required minerals, reporting scope and template version with the customer before asking the supplier to complete a report.
- US — forced labour / traceability: under UFLPA, US Customs can detain goods where the supply chain cannot be traced. Material origin documentation is the defence.
- Tariff exposure: many Chinese-origin goods carry additional duties under Section 301, calculated on the HTS code and the current list. Confirm the classification and the duty with your customs broker before you compare quotations — a 25 % delta changes the business case.
Inspection evidence
- First article inspection (FAI) — every drawing dimension measured and reported, not just the critical ones. For aerospace work this follows AS9102; for most industrial work a comparable report is enough.
- Critical-dimension report with method — CMM, optical or hand tool, plus the datum scheme used. A number without a method cannot be argued with.
- Certificates of conformance (CoC) — a one-page statement that the parts meet the drawing and the PO, signed.
- Functional evidence where relevant — leak test for cold plates and hermetic packages, flatness map for sealing faces, thermal or pressure test data.
3. Verifying a supplier before the first order
An ISO 9001 certificate on a website proves that a certificate exists. It does not prove the scope covers your process. Three checks take fifteen minutes:
- Verify the certificate with the issuing body, not with the supplier. Certification bodies publish a searchable register; look up the certificate number and check the scope wording and the expiry date.
- Check that the address on the certificate matches the address that will ship. A certificate for a trading office tells you nothing about the workshop.
- Ask for a short video walkthrough of the specific machine and the inspection area, recorded on the day, with the part in frame. Stock footage is easy to spot.
Then order one part, not ten. Pay for a full FAI on a single piece and compare it with your own measurement. That is a cheaper test of a supplier than a failed batch.
4. Incoterms: where the landed cost changes
The Incoterm decides who pays for what between the factory door and yours, and where risk transfers. Four terms cover almost every machining order:
- EXW (Ex Works) — cheapest on paper, most work for you. You arrange export clearance, freight and insurance. Attractive only if you already have a forwarder in Shenzhen.
- FCA (Free Carrier) — the supplier clears export and hands over to your forwarder. Usually the cleanest choice for air freight.
- FOB (Free On Board) — sea freight only, risk transfers when the goods are on the vessel. Common in China, but it exposes you to origin-port charges that are rarely itemised.
- DDP (Delivered Duty Paid) — the supplier delivers to your door with duty paid. Convenient, but you lose visibility of the duty and the import VAT recovery, and some suppliers quietly build a margin into the freight.
Whatever you choose, put it in the quotation, not just in the email thread. The Incoterm and the named place belong in the same line: FOB Shenzhen, not FOB.
5. Quality gates worth writing into the PO
- Drawing revision — the exact revision letter, referenced in the PO. Most disputes are two revisions apart.
- Critical characteristics — list the dimensions that actually matter, with the measurement method. Everything else can follow general tolerance.
- Sampling — for series production, agree an AQL level (ISO 2859-1) and the inspection level rather than “we check every part”.
- Change control — no material substitution, process change or subcontracting without written approval. This single clause prevents most surprises.
- Packaging — surface protection, moisture barrier, and how parts are separated. Cosmetic parts damaged in transit are a total loss, not a rework.
6. Protecting your drawing
Send the minimum needed to quote, and send it under NDA. A drawing marked “for quotation only”, with the title block visible but the assembly context removed, is enough for most machining quotes. Ask in writing who will see the file, whether it is stored on a shared drive, and whether the supplier keeps tooling or fixtures after the order. Ownership of tooling should be stated explicitly — it is the one asset that survives a supplier change.
7. Failure modes we see most often
- Material substitution that is chemically close but not per drawing (6061 instead of 7075, C110 instead of C101), discovered only at certification.
- Tolerance drift on thin walls and deep cavities after finishing — the part was in tolerance before anodizing, not after.
- Coating thickness outside the drawing on masking boundaries, because the mask was drawn in a rush.
- A certificate that covers the material but not the heat number actually used.
- Freight damage on cosmetic surfaces because parts were packed in bulk rather than in trays.
8. One-page checklist
- Drawing revision confirmed in the PO
- Material certificate type agreed (EN 10204 3.1 / 2.2 / MTR)
- Heat number traceable to the parts in the box
- RoHS and REACH declarations dated within the last 12 months
- Customer-requested minerals template agreed: CMRT for 3TG; EMRT if cobalt reporting is required
- HS / HTS code confirmed with the broker, duty calculated
- Incoterm and named place in the quotation
- FAI report on the first article, with measurement method
- Critical characteristics and sampling level agreed
- Change-control and tooling-ownership clauses signed
- Packaging method confirmed for cosmetic parts
If you are evaluating a Chinese machining supplier and want the drawing reviewed before you commit, send the STEP file through our RFQ form — the DFM review comes back with the tolerances we can actually hold on your geometry, and the documents we can supply with the shipment.