Manufacturing Guides
Wire EDM Tolerances and Surface Finish: A Practical Guide
Rough cuts run Ra 2.8 µm; skims walk it to 0.2. How cut strategy, wire and thickness set what you actually get.
ReadTry a part name, a material (Kovar, SUS304) or a process (CNC turning, anodizing). Press Enter for full results.
Resources
Tolerance guides, material comparisons and process notes written for engineers and buyers — each linked to the products and capabilities it explains.
Manufacturing Guides
Rough cuts run Ra 2.8 µm; skims walk it to 0.2. How cut strategy, wire and thickness set what you actually get.
ReadMaterial Guides
6061 is the all-rounder you anodize and weld; 7075 is the strength alloy you bolt and coat. Numbers and decision rules inside.
ReadManufacturing Guides
As-machined is Ra 3.2 µm; every halving is a process change. The ladder, the costs, and the three drawing mistakes.
ReadManufacturing Guides
Type II protects and takes color at 2–25 µm; Type III hardcoats wear surfaces at 25–75 µm — and half the coating grows into…
ReadManufacturing Guides
Seven items make a complete RFQ — and earn a DFM-reviewed answer within 1–2 business days.
ReadManufacturing Guides
Mill the bulk, EDM the precision: hardness, corner radii and geometry decide which process earns each feature.
ReadManufacturing Guides
Aperture rules, burr control and material choices for etched encoder discs, shields and photonics parts.
ReadManufacturing Guides
Specify selective gold-plating areas, coating layers and inspection requirements for precision components. Prepare a drawing-led enquiry for engineering review.
ReadMaterial Guides
Plan Kovar machining for laser housings: material specification, datums, sealing faces, selective plating, inspection and a practical RFQ checklist.
ReadManufacturing Guides
Compare aluminum and copper cold plates by material, weight, channels, joining and test scope. Includes a supplier-review and drawing RFQ checklist.
ReadRequest a Quote
Upload your drawing and tell us your material, tolerance, quantity and application. Our engineering team replies within 1–2 business days.